;

3.27 Estimating Slope with Variable Data Example #3: Connect High and Low Data Points

This is a free preview and your progress is not being tracked. Purchase access to complete this module for CEUs.

Here are mine. So the top one is flat, and the bottom one is increasing. And our original blue line is decreasing. So, what do we do now? Remember, we want to adjust the angle of the blue line to reflect the rest of the data.

A graph displaying variable data points representing the number of sessions over time, allowing for estimating the slope.
Post a comment
This section is for the civil and public discussion of the content of this page. We reserve the right to moderate and remove comments that are irrelevant, disrespectful, hateful, harassing, threatening, or spamlike. If you are experiencing a technical issue, please contact our helpdesk for assistance.

Leave a Comment