;

2.9 Using a Band to Estimate Level: Too Low

This is a free preview and your progress is not being tracked. Purchase access to complete this module for CEUs.

Let’s talk a little more about using this band to estimate the level before you practice. Here is a data path. If we put the level band here, it’s covering about 6 data points. But what about those 4 higher data points? Those influence the level of the data path, as well. Remember, we want the band to cover most of the data points, but we also need to adjust it, so that about half of the outlying data points are above it and half of the  outlying data points are below it. 

A bar graph displaying an estimate level of 2.9, indicating the band is too low.
Post a comment
This section is for the civil and public discussion of the content of this page. We reserve the right to moderate and remove comments that are irrelevant, disrespectful, hateful, harassing, threatening, or spamlike. If you are experiencing a technical issue, please contact our helpdesk for assistance.

Leave a Comment